|
|
|
![]() Problem 5.51- Sod Installation This customer has only a small rectangular box that needs sod. Establish the correct grade first, and prepare the base properly. Allow for the thickness of sod. Spread the fertilizer. Follow the instructions and install the sod. Use proper lifting techniques for sod. Return to "About the Exam" |
| 950 Herndon Parkway, Suite 450 • Herndon, Virginia 20170 • (703) 736-9666 • (800) 395-2522 • Fax: (703) 736-9668 webmaster@landcarenetwork.org • Copyright 2005-2010 • Privacy Policy |