|
|
|
![]() Problem 7.76A - Pipe Installation Equipment (Trencher) The underground utilities have just been marked. Once you are sure of their location, check if the machine is ready to use. You only dig a single trench, then backfill and fine grade using the tools provided. Return to "About the Exam" |
| 950 Herndon Parkway, Suite 450 • Herndon, Virginia 20170 • (703) 736-9666 • (800) 395-2522 • Fax: (703) 736-9668 webmaster@landcarenetwork.org • Copyright 2005-2010 • Privacy Policy |